【AipuWaton】Case Studies: Mauritania Olympic Stadium

PROJECT LEAD

Mauritania Olympic Stadium
Case Studies

LOCATION

Mauritania

PROJECT SCOPE

Supply and installation of ELV cables at Mauritania Olympic Stadium in 2018.

REQUIREMENT

AIPU CABLE SOLUTION

Verified compliance with both local and industry-specific requirements.
ensuring that the selected cables would meet the installation’s environmental demands.

Solution Mentioned

Lihh Cable

Cat6 UTP


Post time: Aug-06-2024