PROJECT LEAD Gautam Buddha Airport LOCATION Nepal PROJECT SCOPE Supply and installation of ELV cable and Structured Cabling System at Khartoum Airport, 2018. REQUIREMENT ELV cable, Structured Cabling System AIPU CABLE SOLUTION Verified compliance with both local and industry-specific requirements. ensuring that the selected cables would meet the installation’s environmental demands. Solution Mentioned RS485 Click Here Lihh Cable Click Here Cat6 UTP Click Here Post time: Jul-30-2024