PROJECT LEAD Roberts International Airport (RIA) LOCATION Liberia PROJECT SCOPE Supply and installation of CCTV composed of 22 cameras for the Aerodrome Engineering Buildings at Khartoum Airport, February 2010. REQUIREMENT CCTV, ELV cable AIPU CABLE SOLUTION Verified compliance with both local and industry-specific requirements. ensuring that the selected cables would meet the installation’s environmental demands. Solution Mentioned RS485 Click Here Lihh Cable Click Here Cat6 UTP Click Here Post time: Jul-23-2024