PROJECT LEAD HSBC in UAE LOCATION UAE PROJECT SCOPE The provision and setup of ELV cable, Structured Cabling System for the HSBC tower in the UAE, start in 2015. REQUIREMENT CCTV, ELV cable AIPU CABLE SOLUTION Verified compliance with both local and industry-specific requirements. ensuring that the selected cables would meet the installation’s environmental demands. Solution Mentioned RS485 Cable Click Here Cat6 UTP Cable Click Here Post time: Jul-02-2024