[AipuWaton]Case Studies: Kenneth Kaunda International Airport

PROJECT LEAD

Kenneth Kaunda International Airport

Case Studies

LOCATION

Zambia

PROJECT SCOPE

Supply and installation of ELV cables for the Kenneth Kaunda International Airport in 2017.

REQUIREMENT

AIPU CABLE SOLUTION

Verified compliance with both local and industry-specific requirements.
ensuring that the selected cables would meet the installation’s environmental demands.

Solution Mentioned

RS485 Cable

Lihh Cable

Cat6 UTP


Post time: Jul-17-2024