[AipuWaton]Case Studies: Khartoum International Airport Sudan

PROJECT LEAD

Khartoum International Airport Sudan

Case Studies

LOCATION

Sudan

PROJECT SCOPE

Supply and installation of CCTV composed of 22 cameras for the Aerodrome Engineering Buildings at Khartoum Airport, February 2010.

REQUIREMENT

CCTV, ELV cable

AIPU CABLE SOLUTION

Verified compliance with both local and industry-specific requirements.
ensuring that the selected cables would meet the installation’s environmental demands.


Post time: May-28-2024